Please use this identifier to cite or link to this item: http://cris.utm.md/handle/5014/139
DC FieldValueLanguage
dc.contributor.authorPEREZ-ACEBO, Heribertoen_US
dc.contributor.authorMINDRA, Nicolaeen_US
dc.contributor.authorRAILEAN, Alexandruen_US
dc.contributor.authorROJI, Eduardoen_US
dc.date.accessioned2020-03-08T09:54:50Z-
dc.date.available2020-03-08T09:54:50Z-
dc.date.issued2016-10-07-
dc.identifier.citationHeriberto Pérez-Acebo, Nicolae Mindra, Alexandru Railean & Eduardo Rojí (2019) Rigid pavement performance models by means of Markov Chains with half-year step time, International Journal of Pavement Engineering, 20:7, 830-843, DOI: 10.1080/10298436.2017.1353390en_US
dc.identifier.issn1029-8436-
dc.identifier.urihttp://cris.utm.md/handle/5014/139-
dc.description.abstractPavement management systems employ pavement performance models to plan the most effective allocation of public funds. The most used models are the deterministic and the probabilistic or stochastic ones. Among stochastic models, the Markov Chains are receiving considerable research attention. In this paper, transition probability matrices (TPMs) are presented for Portland Cement Concrete (PCC) pavement road network in the Republic of Moldova with available International Roughness Index (IRI) data collected in spring and in autumn from 2013 to 2015. Although one-year cycle time is usually employed, half-year cycle time was defined to handle a bigger amount of transitions. The aim of this paper is to prove that TPMs for rigid pavements can be developed using IRI values from a short period, with a half-year step time, for a road network where the time since last major rehabilitation varies in each section and where maintenance and rehabilitation activities are carried out simultaneously. In order to consider all these aspects, some assumptions must be made. Roughness seasonal variations can arise in PCC pavements due to the effect of curl and warp. Hence, a threshold of 0.40 m/km was defined as the maximum improvement on a section after half-year step for not being considered as maintenance work or spurious data. When the IRI value improves more than 4 m/km after one step, a rehabilitation activity is considered. That rehabilitation is not used in the matrix calculation, but the subsequent deterioration contributes. Results demonstrate that rigid road sections can jump two condition states in one transition, instead of only remaining in the same condition state or shifting to the next one. Obtained matrices give an overview of deterioration tendencies of rigid pavements, and they fit better to real data if a large proportion of no rehabilitated or maintained sections are compared to predicted values.en_US
dc.language.isoenen_US
dc.relation.ispartofINTERNATIONAL JOURNAL OF PAVEMENT ENGINEERINGen_US
dc.subjectTransition probability matricesen_US
dc.subjectPortland cement concrete pavementsen_US
dc.subjectMarkov Chainsen_US
dc.subjectpavement managementen_US
dc.subjectpavement deteriorationen_US
dc.subjectinternational roughness indexen_US
dc.subjectprobabilistic modelsen_US
dc.subjectrigid pavementsen_US
dc.titleRigid pavement performance models by means of Markov Chains with half-year step timeen_US
dc.typeArticleen_US
dc.identifier.doi10.1080/10298436.2017.1353390-
item.grantfulltextopen-
item.languageiso639-1other-
item.fulltextWith Fulltext-
crisitem.author.deptDepartment of Roads, Materials and Machines for Construction-
crisitem.author.orcid0000-0002-7472-2108-
crisitem.author.parentorgFaculty of Architecture and Urban Planning-
Appears in Collections:Journal Articles
Files in This Item:
File Description SizeFormat
Rigid_pavement_performance_models_MINDRA_Nicolae.pdf50.38 kBAdobe PDFView/Open
Show simple item record

Google ScholarTM

Check

Altmetric

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.